Complete House Renovation
CESME HOUSE RENOVATION
Before the Cesme House renovation, a plan of the house renovation application should be prepared with the joint participation of the people living under the same roof. A list of needs and priorities should be created for the living room, kitchen, bathroom, bedroom and other parts of the house that need to be replaced or repaired. After determining the needs and priorities, contact should be made with the company that will carry out the home decoration application, and ideas should be exchanged in detail on the plan. Since applications that give excellent results in any house may be insufficient in a different house, projects that can be called duplicates should be avoided and a renovation project should be prepared according to the needs of your home.
HOW MANY DAYS WILL THE CESME HOUSE RENOVATION TAKE?
Cesme house renovation period, the applications to be made and the furniture, cabinet, shower cabin, etc. to be used in the application. It varies according to the manufacturing time of the materials, whether the house is empty or a furnished house. The complete renovation of a 3+1 average sized empty house takes between 20-25 days. The renovation period of a furnished house can take between 30-35 days.
HOW TO MAKE A CESME HOUSE RENOVATION
Fountain home decoration applications should be considered as a whole, if possible, the renovation application should cover every part of the house. In cases where it is not possible to make a complete renovation, a priority order should be prepared and maintenance and repair works should be completed in time and in harmony with other departments.